UFx.py version 1.6 from 07/16/2018
Page 1 of 2
Created by user vjeran on 07/17/2018 14:12:51
SLAC Moving Stretched Wire Magnetic Field Measurement Summary
Magnet ID : | Calibration |
Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+Bx_upstream\Final Results\Stretched Wire |
Date : | 06-29-2018 |
Time : | 16:22:31 - 17:26:51 |
Operator : | VV |
Project : | LCLS-II |
Device Type : | Phase Shifter |
Run Number : | 1 |
Data Type : | |
Run Comment : | 126 Gauss*cm magnet rotated, +Bx, upstream pos |
gap | I1Y | I2Y | I1X | I2X |
- |
-12.0 1.0 (5) |
-3.5 0.2 (5) |
121.1 0.8 (5) |
40.6 0.6 (5) |
integral | gap | -02.00;+00.00 | -01.00;+00.00 | +00.00;+00.00 | +01.00;+00.00 | +02.00;+00.00 |
I1Y |
- |
-15.2 1.6 (3) |
-12.1 0.5 (3) |
-13.5 1.2 (3) |
-12.1 0.5 (3) |
-12.6 1.5 (3) |
I2Y |
- |
-3.8 0.5 (3) |
-3.5 0.3 (3) |
-3.8 0.5 (3) |
-3.3 0.2 (3) |
-3.5 0.3 (3) |
I1X |
- |
119.4 0.8 (3) |
119.8 0.1 (2) |
119.9 0.1 (2) |
119.5 0.5 (3) |
119.8 0.1 (2) |
I2X |
- |
40.4 0.0 (3) |
40.4 0.4 (3) |
40.5 0.2 (3) |
40.2 0.1 (3) |
40.4 0.4 (3) |
integral | gap | +00.00;-02.00 | +00.00;-01.00 | +00.00;+00.00 | +00.00;+01.00 | +00.00;+02.00 |
I1Y |
- |
-11.9 1.3 (3) |
-11.8 1.3 (3) |
-11.8 1.4 (3) |
-12.3 0.5 (3) |
-11.4 0.9 (3) |
I2Y |
- |
-3.2 0.3 (3) |
-3.6 0.3 (3) |
-3.5 0.3 (3) |
-3.4 0.3 (3) |
-3.6 0.3 (3) |
I1X |
- |
121.0 1.4 (3) |
116.6 1.3 (3) |
118.6 3.1 (3) |
118.5 2.1 (3) |
117.5 2.2 (3) |
I2X |
- |
40.6 0.3 (3) |
40.3 0.2 (3) |
40.5 0.3 (3) |
40.4 0.2 (3) |
40.4 0.4 (3) |
UFx.py version 1.6 from 07/16/2018
Page 2 of 2
Created by user vjeran on 07/17/2018 14:12:51
SLAC Moving Stretched Wire Magnetic Field Measurement Summary
Magnet ID : | Calibration |
Directory : | S:\magdata\LCLS-II\Phase Shifter\Calibration\126Gcm_+Bx_upstream\Final Results\Stretched Wire |